Operators of hospitals and clinics are responsible for the safety of their electrical equipment and installations. To ensure safety, all electrical installations and equipment must be checked regularly in accordance with accident prevention regulation DGUV Regulation 3. Carrying out periodic verification requires a great deal of organisation, time and personnel.
Bender offers a simple and standard-compliant solution that significantly reduces the time and effort required for periodic verification in accordance with DGUV Regulation 3 and at the same time ensures safe operation. With continuous monitoring of parts or the entire electrical installation (condition monitoring), the time-consuming Riso inspection as part of DGUV Regulation 3 can be dispensed with.
In addition, we offer Bender POWERSCOUT®, a cloud-based software solution that records, stores, visualises and documents all the important measured values of an electrical installation. The installation documentation available in POWERSCOUT® reduces the time and effort required for periodic verification in accordance with the German DGUV Regulation 3.
Contact our experts for a reliable power supply in hospitals.
To contact formProducts
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor with one alarm contact per channel
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor with one alarm contact per channel
Condition monitor with display and an integrated gateway
Recognising connections – optimising maintenance
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor with one alarm contact per channel
Multichannel AC, pulsed DC and AC/DC sensitive residual current monitor with one alarm contact per channel
Condition monitor with display and an integrated gateway
Recognising connections – optimising maintenance
Name | Category | Size | Language | Timestamp | D-/B-Number |
---|---|---|---|---|---|
Product Overview - Residual Current Monitoring | Product Overviews | 6.3 MB | EN | 2024/10/2929.10.2024 | |
Electrical safety costs little | Market Segment Brochures | 7.6 MB | EN | 2024/05/0202.05.2024 | |
COMTRAXX® CP9…-Industrial | Product Brochures | 1.8 MB | EN | 2024/07/2929.07.2024 | D00418 |
POWERSCOUT® | Product Brochures | 3.1 MB | EN | 2023/12/1919.12.2023 |
Electrical installations of buildings - Part 7-710: Requirements for special installations or locations - Medical locations
Low-voltage electrical installations - Part 7-710: Requirements for special installations or locations - Medical locations (IEC 60364-7-710:2002, modified); German implementation HD 60364-7-710:2012
Low-voltage switchgear and controlgear - Part 6-1: Multiple function equipment - Transfer switching equipment